From: route@monster.com
Sent: Thursday, April 07, 2016 11:54 AM
To: hg@apeironinc.com
Subject: Please review this candidate for: p6 Scheduler
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
Russ Bateman
Updated 2/15 2142 O’Neal Lane, Apt. 121
CMMS Planning & Scheduling Baton Rouge, La. 70816
Primavera P-6 CPM Scheduling (225) 281-6485
EPC/FEL
Scheduling/Project Controls russ.bateman@rocketmail.com
Upstream/Downstream LNG Scheduling
Oil Refinery/Production Planning/Scheduling
Education:
- Project Management in
Primavera P-6 – Oracle IMS Training Facility,
Sugarland, Tx.
- T2 – Oil Production Systems Training – Safety & Training Consultants,L.L.C., Houma,La.
- Industrial Instrumentation - International Technical Institute,
Baton Rouge, La.
- PLC Operations and Maintenance - 3M Training Facility, St. Paul, Mn..
- NCCER Certified Instrument
Technician / Current TWIC & OSHA Cards Experience: 1/15
to Present Lead T/A Primavera P-6 Scheduler/Planner –
HollyFrontier Refinery - PerSe Group, Inc.- Tulsa, OK. Provide all the
planning, scheduling, and budget estimates for
HollyFrontier Crude Unit Turnaround. Initiate meetings,
identify T/A work scope, plan and build bid packages and job package folders.
Create and maintain multiple W.B.S. structured – CPM driven P-6 schedules .
Create initial P-6 “Global” activity code databases with unit, system and
equipment information. Resource load and level schedules and as required. Using Primavera
P6- Professional w-Web Based EPPM– Rel. 8.3, Immpower CMMS, MS-Excel &
Word 1/13
to 12/14 Site Master Scheduler – Williams Olefins
Midstream LNG – Integrated Consulting - St. Gabriel, LA. Responsible
for creating “Master Schedule” by integrating a multiple
sub-contractor schedules using latest CPM, EVM
and PMBOK techniques. Develop budget, progress and manpower
curves for weekly reporting. Performed regular Monte Carlo “Risk
Analysis” , “Claim Digger” and “Schedule Checks” on submitted schedules
in order to maintain sub-contractor and Master Schedule integrity.
Reviewed contractor “Resource Allocation” strategies to in order to decrease
Milestone risk exposure. Using Primavera
- P6 – Rel. 7 , MS Excel and MS Word to perform required tasks. 6/12
to 1/13 Enterprise/Master Scheduler –
Bayer Chemical Plant – Belcan Corp.- Baytown, TX. Created and maintained
5 Primavera P-6 Schedules and one “Master” Portfolio Schedule
along with Excel Resource Plans for a multi-unit Emerson Delta-V (DCS)
Migration Project. This was accomplished over several turnarounds
dealing with 5 separate units. Resource loaded scheduling , S-Curve
forecasting and Critical Path Analysis instituted for all projects. Using
Primavera - P6 , MS Excel and MS Word to perform required tasks. 2/11
to 3/12 Senior Planner -Scheduler –
Lummus Upstream LNG Units –Weston Engineering, Corp.– Williston, N.D. Performed planning,
scheduling for mechanical construction work for a dual-train LNG
gas units . Developed CPM schedules for EPC progress and
manpower curves for management. Also was responsible for generating weekly
Excel –based tracking reports and Risk Management reports for upper
management.
Used Primavera - 6 , MS Excel and Word to perform required tasks.
3/07
to 1/11 EPC Project Planner-Scheduler – Bestech,
Inc. – Maurepas, La. Provided over-all
resource planning and Primavera project schedules for various Midstream and
Downstream LNG projects. Prepared and managed overall Master Project
schedules integrating the Work Breakdown Structures from inter-discipline
schedules. Monitored contractor activity progress and updated schedules.
Evaluated project schedule Critical Paths and recommended strategies to
resolve issues. Provided weekly client Project Progress Reports . Projects included
E&I and Mechanical On-shore/Off shore oil production and pipeline
projects.
Used Primavera - P6 , MS Excel, MS Word and SAP to perform required
tasks.
3/05
to 1/07 Project Coordinator/Planner
-Scheduler – Industrial Specialties Corp., – Baton Rouge, LA,
Performed planning, scheduling and inter-discipline coordination for
electrical and instrumentation work
required for Shell-Motiva /Convent Refinery Triconex Safety System Upgrade.
Used Primavera - P6 , MS Excel, MS Word and SAP to perform required
tasks.
10/00
to 11/02 Maintenance Planner - Scheduler – Willamette
Industries; Power Plant Maintenance – Port Wentworth, GA.
Responsible for issuing work orders and scheduling all electrical and
instrument work for maintenance and
turnaround work at a pulp and paper mill. Also purchased all E&I parts,
tools and test equipment as well as
provide field supervision on special projects. Used Primavera -
P3 , MS Project, Excel and Word to perform tasks. 8/90
to 11/96 I&C Project Engineer –
CP&L-Brunswick Power Station; Energy Services Group – Southport, N.C.
Responsible for project management, design, installation and testing for the
addition of 5 instruments panels
to the plant simulator to aid in operator training. Used Primavera P-3
and MS-Project for planning and scheduling.
Used
Primavera - P3 , MS Project, Excel and Word to perform tasks. |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Beginner |
|
|
|